ISSUES

  • MNG-HA’s KASCH (King Abdullah Specialized Children’s Hospital) was expected to open on Oct. ’14, but was delayed twice due to security and safety issues.
  • Commissioning project was required to analyze current status & provide solution, prior to the actual opening of the hospital.

APPROACH

  • Developed a checklist covering safety and security issues in opening a medical facility.
  • Discovered core problems through documentation review and on-site inspections of facilities and medical equipment with the assistance from professionals.
  • Provided solutions for each issue derived from inspections and suggested optimal action plan covering allocation of man power with appropriate scheduling to open KASCH as scheduled.

RESULTS

  • Preparation tasks was proceeded in accordance with our suggested plan and roadmap, and KASCH successfully opened on April 5, 2015.